Skip to content
Company · Timeline

Two years and counting.

Verifiable milestones from incorporation through Phase 3 target. Each entry tied to a date, an artefact, and a category (Founding · Engineering · Doctrine · External · Press).

  1. 01 / 102024-05-27
    Founding

    Company incorporated

    UAM Korea Tech Co., Ltd. registered in Seoul, Republic of Korea. Founder Park Moojin opens with a singular thesis: encode allied IPB doctrine in catalog primitives.

  2. 02 / 102024-12-29
    External

    Muan accident · 7C2216

    Jeju Air flight 7C2216 collides with birds during approach to Muan International Airport, killing 179 — deadliest civilian aviation accident in Korean history. The schema gap that would have flagged the threat had never been in the operator's catalog.

  3. 03 / 102026-03-23
    Engineering

    AVIX-AI V5.1 schema submission

    `platform_type: Animal` schema submitted to Anduril Developer Zone (Sent ID FMfcgzQgLPSDPNVTfVzPMpntljFwkBrV). Rationale: catalog gap, four-century arc, doctrine-tagged response.

  4. 04 / 102026-04-20
    Engineering

    19/19 HTTP 200 demonstration

    Incheon Technopark notice 2026-177 demonstration · commit fbcb327 · 19/19 entity API submissions returned HTTP 200 across the test corpus. The reproducibility baseline.

  5. 05 / 102026-04-24
    External

    Lattice catalog adoption

    Anduril Lattice Dashboard April 2026 release ships `platform_type: Animal` and `aliases.name: Bird (Species)` natively. The submission becomes precedent for the partner namespace pattern.

  6. 06 / 102026-04-26
    Press

    V2.3 site narrative pivot

    uamkt.com narrative restructured from product-tile-first to story-first per CEO direction (V2.3 spec). Scaffolds the editorial discipline the Phase 1 launch will inherit.

  7. 07 / 102026-04-30
    Doctrine

    BD package + dev spec issued

    Anduril John BD package finalised; UAMKT-SITE-DEVSPEC-V1 published, beginning the codebase rebuild on Next.js 14 + Anduril/Helsing visual language.

  8. 08 / 102026-05-30
    Engineering

    Phase 1 MVP launch

    Codebase ready · 14 Phase 1 spec pages live · Lighthouse-ready · Vercel deploy gated only on CEO DNS swap. Sprint 1-6 complete in 30 days.

  9. 09 / 102026-06-30
    Engineering

    Phase 2 expansion (target)

    +15 spec pages — Solutions detail, Technology detail, Software full pages, Company expansion (Leadership / Compliance / Channels), Insights expansion (Whitepapers / Research), Newsroom (In the News).

  10. 10 / 102026-07-31
    Engineering

    Phase 3 + i18n (target)

    Investors / Timeline / API docs / Careers / Resources expansion + formal `/ko/` Korean translations via next-intl.